Disputes as Risks: A Transformative Approach

Authors

  • Ali Al-Khalifa

Abstract

Traditional approaches to dispute resolution, such as arbitration and litigation, are often reactive, costly, and untimely. These methods often focus on contract variations, rather than addressing the root causes of disputes. In contrast, this study proactively addresses underlying issues. The purpose of this study is to analyse the effectiveness of treating potential disputes as risks to prevent conflicts in construction projects from evolving into disputes. This study highlights the negative impacts of disputes in construction projects, presents case studies in which potential disputes are treated as risks, and compares the outcomes with those of previous similar projects performed under the same scope and circumstances. By identifying potential disputes in the Risk Register and addressing them as risks or opportunities, disputes are integrated into a project’s risk management framework. By identifying potential conflicts early in the project lifecycle, this proactive approach allows teams to manage conflicts before they escalate into formal disputes, thereby avoiding costly delays and budget overruns. Case studies from the Gulf Cooperation Council (GCC) region, including those recognised as ‘Building Project of the Year’ and ‘Small Project of the Year’ at the MEED Projects Awards 2024, illustrate the practical application and effectiveness of the proposed approach.

Author Biography

  • Ali Al-Khalifa

    Chief Executive Officer, Zones Development, Qatar Free Zone Authority, P.O. Box 258, Doha, Qatar

References

[1]. M. Ayhan. “Development of dispute prediction and resolution method selection models or construction disputes.” PhD thesis, Open Middle East Technical University, Ankara, 2019.

[2]. Arcadis. “2022 Global Construction Disputes Report.” Internet: www.arcadis.com/en/insights/perspectives/global/global-construction-disputes-report [Oct. 14, 2025].

[3]. H. Emam, P. Farrell, and M. Abdelaal. “Causes of delay on infrastructure projects in Qatar.” Proceedings of 31st Annual ARCOM Conference, 2015, pp. 773-782.

[4]. N.B. Chaphalkar, S. Patil, and S. Sawant. “Factors influencing disputes in the construction industry.” Procedia Engineering, vol. 123, pp. 1-9, 2015.

[5]. T. Stipanowich. “ADR and the vanishing trial: The growth and impact of alternative dispute resolution.” Journal of Empirical Legal Studies, vol. 1, pp. 843-912, 2010.

[6]. Project Management Institute (PMI). A Guide to the Project Management Body of Knowledge (PMBOK Guide), 6th ed. Newtown Square, PA: Project Management Institute, 2017.

[7]. International Organization for Standardization (ISO). “ISO 31000:2018 Risk management — Guidelines.” Internet: www.iso.org/standard/65694.html [Oct. 14, 2025].

[8]. H. Zhu and S. Cheung. “A conflict management framework for construction projects.” International Journal of Project Management, vol. 38, pp. 12-21, 2020.

[9]. J. Doe and J. Smith. “The inefficiencies of traditional dispute resolution mechanisms in construction projects.” Journal of Construction Engineering and Management, vol. 149, pp. 123-134, 2023.

[10]. M. Ruqaishi and H. Bashir. “Causes of construction delays in the oil and gas industry in the Gulf Cooperation Council countries: A case study.” Journal of Management in Engineering, vol. 31, pp. 05014017, 2015.

[11]. E. Johnson and M. Brown. “The financial implications of arbitration and litigation in construction disputes.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 14, pp. 45-56, 2022.

[12]. S. Lee and M. Thompson. “Adversarial vs. collaborative approaches in construction dispute resolution.” Journal of Construction Engineering and Management, vol. 147, pp. 04021012, 2021.

[13]. R. Al-Sabah and O. Refaat. “Assessment of construction risks in public projects located in the state of Kuwait.” Journal of Engineering Research, vol, 7, pp. 13-32, 2019.

[14]. E. Cakmak and P.I. Cakmak. “An analysis of causes of disputes in the construction industry using analytical network process.” Procedia - Social and Behavioral Sciences, vol. 109, pp. 183-187, 2014.

[15]. C. Anderson. “The positive and negative effects of anger on dispute resolution: Evidence from electronically mediated disputes.” Journal of Applied Psychology, vol. 86, pp. 1045-1055, 2001.

[16]. S.O. Cheung and T.W. Yiu. “Are construction disputes inevitable?” IEEE Transactions on Engineering Management, vol. 53, pp. 456-470, 2006.

[17]. F. Gamage. “Dispute risk management in construction projects through effective contract management.” Scholars Journal of Engineering and Technology, vol. 3, pp. 53-65, 2023.

[18]. Y. Gamil and I. Rahman. “The role of communication in dispute prevention in the Yemeni construction industry.” Journal of Construction Engineering and Management, vol. 148, pp. 04022031, 2022.

[19]. R.J. Gebken and G.E. Gibson. “Quantification of transactional costs for dispute resolution procedures in the construction industry.” Journal of Professional Issues in Engineering Education and Practice, vol. 132, pp. 264-271, 2006.

[20]. T. Umar. “An overview of construction disputes in the GCC region.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 14, pp. 110-122, 2022.

Downloads

Published

2025-10-20

Issue

Section

Articles

How to Cite

Al-Khalifa, A. . (2025). Disputes as Risks: A Transformative Approach. American Scientific Research Journal for Engineering, Technology, and Sciences, 103(1), 225-247. https://asrjetsjournal.org/American_Scientific_Journal/article/view/12081